Drilling Location Works Civil Works Drilling Locations Works Midrar shall provide group equipment and including all labour, supervision, management, equipment, tools, materials, consumables and supplies and to perform all operations necessary and required to perform and complete the civil works not later than the specified completions date for well location Description of scope of work for drilling rig site & access road & camp site as following. Construct oil drilling rig site prepare, making material, cutting filling grading spraying water compacting platform to approximately 150x150 to suit drilling rig, leveling spraying water and compacting under the oil-drilling rig Avery 20 cm lift spray water compact shall be of standard adequate to insure an Evan and stable base for heave loads such as rig sub- base mud pumps and tanks. The finished lever of the earthen platform shall be safe and level. Or the measurement required from company. Construct oil drilling access road from main road to the location to approximately 6m or 7m wide cutting filling grading spraying water compacting included road repairing maintenance, or the measurement required from company. Drilling sump mud cutting filling and leveling to approximately 40mx25mx2m (L X W X H) the minimum capacity of 10,000 barrels, the sump floor using fane mixed material with water, the sump floor thickness 30cm minimum for every 15cm lift grading spraying water and compacting, the bid must be lined with liner material double layer water-proof plastic liner final specifications of pit liners to be approved by the COMPANY before use) or the measurement required from company. Construct cellar crip 3.00m x3.00m x 2.00m (L X W X H) on the oil- drilling site to the design specified using metal iron plate and tubing pipe 2.5 inch, for oil-drillings site. Or the measurement required from company. Excavate drilling well center 2.5m x 2.5 x5.0 (L X W X D) or until you get pet rock /hard rock, this will include sating conductor pipe and cementing. Or the measurement required from company. Construct two water storage sump (2) x 20mx20x2m water pits,) the minimum capacity of 4,000 or 5,000barrels prepare, material, cutting and filling grading watering compacting, the sump floor thickness 30cm minimum for every 15cm lift grading spraying water and compacting, the bid must be lined with liner material double layer water-proof plastic liner final specifications of pit liners to be approved by the COMPANY before use) or the measurement required from company. Midrar will supply (pit water proof liners for water pits the thickness of the liner is final specifications of pit liners to be approved by the company. Construct Drilling rig camp prepare, material, cutting, filling, grading watering and compacting platform to approximately 100 x 60 to level area the finishing level of the earthen platform shall be safe and level. for oil-drilling site , Construct flare pit for the location: Construct flare pit for the location to shape and size of the waste pit to approximately 10mx.4Mx.2m (L X W X D) include all the removal of the excavated material from the location located 100m from well center. Or the measurement required from company. Construct septic system for the location and camp site: waste pit Construct septic system for the location to shape and size of the waste pit to approximately 30x.40x.2m (L X W X D) include all the removal of the excavated material from the location area. Fencing around the rig site and camp site using by 2'' steel pipe as poles one each 3m distance fixed in the ground 30cm in and wire fence is 2m high.